Sedborough Wind Turbines
From Ppca
The proposal (ref: 1/0242/2008/FUL) is before Torridge District Council with a decision expected in September 2008. It can be viewed on-line here
The proposal is for two 100m high (60m to the nacelle) 2MW Turbines. The scale of these turbines relative to the village church just one kilometer away is illustrated on the left.
The full text of our objections can be downloaded from here (~1Mb)
How we have objected
This application is from a private individual and the turbines are situated in a valley. It is therefore not typical. However, several factors have guided us.


